WETMATE – a 33kV Subsea Wet-Mateable Connector for Offshore Renewable Energy
Most European offshore wind farms are currently installed within 20 km of the coast in shallow water depths up to 20m. The next generation will be developed at distances of 40 km in sea depths up to 80m. These new locations present technical challenges fo
- Listing ID: 2100
- Start date: 12/1/2012
- End Date: 9/30/2015
- Region: Canary Islands
- Priority: Marine-maritime
- Programme: FP7-SME-2012
- Participants within MAC area: MARINE SIGNALS SL: 260,026.20
Leave a Reply
You must be logged in to post a comment.